Gas Cylinder Rules Approval usually refers to the statutory or regulatory approval process under the Gas Cylinder Rules (such as Indias Gas Cylinder Rules, 2016 under the Expl-osives Act, 1884) or similar laws in other countries.
The approval process and contents generally include:
Form of application prescribed in the Gas Cylinder Rules.
Details of applicant name, address, nature of business.
Type of approval sought manufacture, filling, storage, transport, import, or sale of gas cylinders.
Design drawing & specifications (materials, wall thickness, welding details, valve type).
Working pressure, test pressure, and gas capacity.
Standard compliance (e.g., IS 7285, ISO standards, BS standards).
Burst pressure and stress calculations.
Design code approval from a competent authority.
Hydrostatic test certificate.
Non-destructive testing (NDT) reports ultrasonic, radiography, magnetic particle inspection, etc.
Material test certificates from steel/metal suppliers.
Heat treatment records (if applicable).
Layout of the manufacturing or filling premises.
Location safety distances as per rules.
Fire protection and emergency handling arrangements.
Approval from local authorities (Factory Inspectorate, PESO in India).
Permanent marking on the cylinder as per rule (manufacturers name, serial number, manufacturing date, test date, water capacity, working pressure, gas name).
Colour coding and hazard labels.
Statement that the cylinder design, manufacturing, and testing comply with the applicable Gas Cylinder Rules and relevant standards.
Undertaking for periodic inspection and re-testing.